Partia Hotel
Partia Hotel Specification
| Employer: | Ghasre Roshan Golestan Co |
| Consultant: | Mandegar Engineering Co |
| Supervision and Inspection: | Mandegar Engineering Co |
| Structure Weight: | 1.500 tons |
| Accomplish: | 6month - 50% |
| Connection System: | Welding |
| Color Type and Decolorization system: | Sandblast SA2 1/2 , phosphate apex Xing |
| Quality Control (QC): | The WPS, PQR and testing NDT (RT, UT, PT, MT) by the Baadband Co |
| Other information: | - |


